Piles of piles!
January 26, 2007 - 10 a.m. Temperature ~ -11 degrees Celsius
The drill and the bobcat that took all that clay away.
Pile locations were marked with spray paint.
This photo shows the height of the machine that did the drilling.
Two of the twenty-two holes.
A look inside...
4:13 p.m.
The cement truck pouring cement into the holes that were drilled in the morning.

0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home